March-April 2019
Carnival Triumph/Sunrise.
Client: Carnival Cruise Line.
Main Contractor: Navantia Cadiz.
Maximum Staff: 550 Op.
Execution Term: 58 days.
Scopes:
- Material handling, cleaning & waste segregation
- Ceiling Management
- Balcony Paint Restoration
- Balcony Teak Restoration
- Balcony Handrail Restoration
- Balcony doors, windows and partition replacement
- Manpower supply:
- Electricians
- Demolition labor
- Masons
- Project Managers
- General labor
- Welders
- Fitters
- Firewatchers
- Open decks protection
- Supply of 2 x 40’ DV Laundry Containers
- Catwalks fabrication and replacement
- Balcony Ballustrades Steel repair
- Incinerator room floor repair
- Hotwell steel repair
- Trunk pipes replacement
- GW tank #5 tank repair
- Deck 5 Casino Side Shell Door Insulation
- Fabricate and replace damged steam coil
- Deck 5 Casino Side Shell Door Insulation
- Supply of SS cabinet
- Catwalk ladder for deck 3 gondola
- Deck 9 aft pizzeria insulation
- Deck 9 Lido – Insulation
- Deck 10 Aft – Insulation
- Deck 8 fwd – Trunk penetration
- Deck 12 external double leaf door
- Steakhouse – SOW replacement steel plate
- Alchemy Bar Insulation
- Bonsai Sushi Insulation
- Piano Bar Insulation
- Red Frog Insulation
- Video Arcade Staircase Insulation
- SportSquare Signage Supports
- General labor support for tank cleaning + closures (slp #458)
- Seachest Foundation repairs (slp #463)
- Pizzeria Deck Repair (slp #442)
- Aft facia preservation (decks 6+7) slp #483
- Deck 10 Aft SS 316 L Covers
- LR Safety rail upgrade 4 stations (slp #474)
- Dk 9 aft insulation
- Deck 10 Aft Plates & Insulation Replacement
- Limelight Lounge Insulation
- Balcony Washing
- Deck A Flor Replacement