March-April 2019

Carnival Triumph/Sunrise.

Client: Carnival Cruise Line.

Main Contractor: Navantia Cadiz.

Maximum Staff: 550 Op.

Execution Term: 58 days.

Scopes:

  • Material handling, cleaning & waste segregation
  • Ceiling Management
  • Balcony Paint Restoration
  • Balcony Teak Restoration
  • Balcony Handrail Restoration
  • Balcony doors, windows and partition replacement
  • Manpower supply:
    • Electricians
    • Demolition labor
    • Masons
    • Project Managers
    • General labor
    • Welders
    • Fitters
    • Firewatchers
  • Open decks protection
  • Supply of 2 x 40’ DV Laundry Containers
  • Catwalks fabrication and replacement
  • Balcony Ballustrades Steel repair
  • Incinerator room floor repair
  • Hotwell steel repair
  • Trunk pipes replacement
  • GW tank #5 tank repair
  • Deck 5 Casino Side Shell Door Insulation   
  • Fabricate and replace damged steam coil
  • Deck 5 Casino Side Shell Door Insulation
  • Supply of SS cabinet
  • Catwalk ladder for deck 3 gondola
  • Deck 9 aft pizzeria insulation
  • Deck 9 Lido – Insulation
  • Deck 10 Aft – Insulation
  • Deck 8 fwd – Trunk penetration
  • Deck 12 external double leaf door
  • Steakhouse – SOW replacement steel plate
  • Alchemy Bar Insulation
  • Bonsai Sushi Insulation
  • Piano Bar Insulation
  • Red Frog Insulation
  • Video Arcade Staircase Insulation
  • SportSquare Signage Supports
  • General labor support for tank cleaning + closures (slp #458)
  • Seachest Foundation repairs (slp #463)
  • Pizzeria Deck Repair (slp #442)
  • Aft facia preservation (decks 6+7) slp #483
  • Deck 10 Aft SS 316 L Covers
  • LR Safety rail upgrade 4 stations (slp #474)
  • Dk 9 aft insulation
  • Deck 10 Aft Plates & Insulation Replacement
  • Limelight Lounge Insulation
  • Balcony Washing
  • Deck A Flor  Replacement